top of page

John Adams Middle School Performing Arts Center

The John Adams Middle School (JAMS) expansion created brand new, cutting-edge performing arts facilities within the existing campus. This dynamic arts center is shared with neighboring Santa Monica College, carefully integrating needs for both middle school and college users. New buildings include a flexible indoor-outdoor rehearsal/multi-purpose hall, a 750-seat auditorium, support and back-of-house areas, and a choir rehearsal room with variable acoustics.

The auditorium incorporates an electronic acoustical enhancement system, including a “virtual shell”, providing users with a wide range of acoustical ambience options, for both music and speech.

MCH provided full acoustical consulting services. Important issues included very quiet background noise levels for superior audio performance; excellent interior and exterior sound isolation for the auditorium and choir room; and tailored, visually-striking acoustical treatments to optimize audio and listening conditions.

The results have been praised by faculty and students alike, and have been featured in numerous publications, including ArchDaily, Architect Magazine, and Architizer.

HGA

Architect:

Square ft:

$30M

Cost:

2021

Completed:

Santa Monica, CA

Location:

Download PDF
bottom of page